One-sided closure of traffic island Lichtenow B1/5

Heavy goods transport is planned on the B1/5 in the direction of Müncheberg. Steel plates have to be laid here to secure the traffic island. A crane is needed to lay the steel sheets. One side of the traffic island at the end of the village of Lichtenow will be closed for the laying and installation of the plates.
A large tailback is to be expected.